Mauritania Railway Iron-Ore Train (Train de Minéral de Fer)
SNIM (Société Nationale Industrielle et Minière) — passenger carriages managed by SOMASERT
Mauritania
Loading Map...
The Journey
Navigate from Zouérat Station to Nouadhibou Station across a span of 704km. This is an overnight service.
Scenery Highlights
The 2.5–3 km long loaded ore train stretching to the horizon — visually one of the most dramatic rail sights on Earth
Passing the Ben Amera monolith (Guelb er Richat region) — at 633 m the world's second-largest exposed rock formation after Uluru, rising sheer from the desert floor
Departure from Zouérat through the open-pit iron-ore mines with their rust-red terraces and giant Caterpillar dump trucks
Crossing the Adrar Plateau wind-scoured sandstone uplands
The Choum Junction desert halt — a lone concrete platform and shelter in the middle of nowhere
Passing the dark volcanic ridges and basalt outcrops south of Zouérat — a different colour palette to the orange sand seas
The long Atlantic approach to Nouadhibou — first sight of the ocean as the train grinds through the Western Sahara Free Zone
Nouadhibou port station itself — the train rolling directly into the ore-loading jetty with cargo ships in the foreground
Sunrise over the Sahara from the open Dweira window on overnight Nouadhibou → Zouérat journeys
The trackside Saharan trader camps at El Ayoun and Inal — informal tea stalls servicing the Mauritanian cross-desert trade
Quick Facts
Duration
14 hours
Distance
704 km
Est. Price
Ultra-affordable (EUR 15–28 one-way; second class EUR 15, first class EUR 25)
Meals: None — bring all food and water for the 14-hour journey
Ensuite: No
Meals: None — bring all food and water for the 14-hour journey
Ensuite: No
Meals: None
Ensuite: No
Engine / Locomotive
SNIM diesel-electric locomotives — typically 2–4 units per train (modern fleet includes EMD SD70ACS, EMD JT26CW-SS, and older Alsthom CC-series; current motive power being progressively replaced under EIB $512M modernisation)
Locomotive Weight
100+ tonnes per locomotive (typical EMD SD70ACS ~192 t; older Alsthom units ~110 t)
Track Gauge
1,435 mm (standard gauge)
Braking Technology
Air brakes on locomotives and wagons (Westinghouse-style); dynamic brake on EMD SD70ACS units; loaded ore trains require distributed braking across all 200+ wagons to prevent run-away on desert grades
Route Engineering Challenges
Sand encroachment on tracks requiring constant ballast cleaning and rail-grinding maintenance — the line's biggest ongoing operational cost
Extreme temperature variations (8°C winter nights to 52°C summer days on ballast)
Remote 704 km route through uninhabited Sahara desert with no road access for emergency response
Water scarcity for crew and passengers — water tanker trains supplement mine supply
Crossing the Polisario-controlled Free Zone of Western Sahara — political sensitivity and military escort required
Iron-ore dust abrasion on locomotive air intakes, traction motors, brake systems and signalling equipment
Single-track configuration with passing loops at Fderîck, Choum, El Ayoun and Inal — limits daily train frequency to ~4 each direction
Heat-related rail expansion ('sun kinks') on exposed sections during summer months
Train Length
Typically 2.5–3 km (200–220 loaded wagons); among the longest trains in the world
Cargo Capacity
Up to 22,000 tonnes of iron ore per train (high-grade hematite from Kedia d'Idjil / Fderîck mines)
Passenger Car
Single 'Dweira' carriage attached at rear of selected freight trains; managed by SOMASERT; no fixed timetable
Iron-Ore Grade
~65% Fe hematite concentrate — among the highest-grade iron ores shipped globally
$512 million European Investment Bank funding for rail modernisation, new locomotives, signalling, security upgrades, and infrastructure improvements (2023–2028, ongoing)
Year Opened
1963 (construction began 1960; opened by President Moktar Ould Daddah)
Construction Era
Built as flagship of post-independence Mauritanian industrial policy; engineered by French and Canadian consultants; mining infrastructure funded by European and World Bank lending
Total Network Length
704 km single-track mainline (Zouérat–Nouadhibou) plus ~80 km of mine-yard and port-side industrial sidings
Daily Train Frequency
Approximately 4 freight trains each direction daily; 1–2 of those carry the Dweira passenger coach
Operator
SNIM (Société Nationale Industrielle et Minière) — Mauritanian state-owned mining and railway company, founded 1974
Passenger Subcontractor
SOMASERT (Société Mauritanienne de Services et de Transports) — manages the Dweira coach under contract to SNIM
Currency onboard
None — fully self-catering; ticket paid in MRU or EUR cash at station ticket office
Languages onboard
Hassaniya Arabic, French, Pulaar, Wolof; some Mauritanian staff speak basic English
Best Photography Segment
Zouérat → Fderîck loaded-departure stretch (rust-red iron-ore terraces, dark volcanic ridges, Adrar Plateau horizon); also the long Atlantic approach to Nouadhibou
Comparable Worldwide Routes
Only a handful of operating railways routinely run 2.5+ km heavy-haul iron-ore trains — Pilbara (BHP / Rio Tinto, Western Australia), Carajás (Vale, Brazil), and Mauritania's SNIM line
Quick Facts
Duration
14 hours
Distance
704 km
Est. Price
Ultra-affordable (EUR 15–28 one-way; second class EUR 15, first class EUR 25)