Suswa Leisure Train

Kenya Railways Corporation
Kenya
Loading Map...
The Journey

Navigate from Nairobi Terminus to Suswa Station across a span of 72km.

Scenery Highlights
  • Traverses the floor of the Great Rift Valley with panoramic views of escarpments
  • Views of Ngong Hills as the train departs Ngong station
  • Maai Mahiu area offers views of volcanic hills and geothermal activity
  • Suswa area is gateway to nearby game reserves and Ololua Forest
  • Elephants and giraffes visible from the elevated railway embankment
Quick Facts
  • Duration

    2.3 hours

  • Distance

    72 km

  • Est. Price

    Budget to Affordable (KES 500–1,000 per person)

Official Booking Provider

Classes & Accommodations

Meals: None

Ensuite: No

Meals: Light snacks and beverages

Ensuite: No


Engine / Locomotive

China Railway Corporation CRRC DF8B diesel-electric locomotive

Track Gauge

1,435 mm (standard gauge)

Braking Technology

Air brakes with electronic control (ETBS), CCB II brake system

Route Engineering Challenges
  • Crosses the Great Rift Valley floor requiring substantial earthworks and embankments

  • 78km extension from Nairobi Terminus through populated peri-urban areas

  • Elevated alignment through wildlife corridors to minimize human-wildlife conflict

  • Single-track operation with passing loops at intermediate stations

Line length

72 km (Nairobi Terminus to Suswa Station)

Journey time

Approximately 2.2–2.5 hours

Maximum speed

100 km/h (passenger service on extension)

Extension opened

Phase 2A: Nairobi–Naivasha–Suswa, completed October 2019

Operator

Kenya Railways Corporation (KRC)

Fleet

CNR Qingdao Sifang passenger cars, DF8B locomotives (shared with Mombasa service)

Quick Facts
  • Duration

    2.3 hours

  • Distance

    72 km

  • Est. Price

    Budget to Affordable (KES 500–1,000 per person)

Official Booking Provider