Kinshasa–Matadi Express

ONATRA (Office National des Transports)
DR Congo
Loading Map...
The Journey

Navigate from Gare Centrale de Kinshasa to Matadi Port Station across a span of 366km.

Scenery Highlights
  • Departure from Gare Centrale de Kinshasa — the rebuilt colonial-era mainline station on the Boulevard du 30 Juin riverfront overlooking the Pool Malebo
  • Livingstone Falls bypass — the 366 km rail route threads the Lower Congo hills to bypass the 32 cataracts that block river navigation between Kinshasa and the Atlantic
  • Kimwenza rail viaduct crossing the Lukaya River valley — November 2025 flood damage was repaired in time for the February 2026 resumption
  • Kisantu botanical gardens stop — the historic 1900 INEAC agricultural-research station remains a popular ONATRA halt with documented photographs from late 2025
  • Lukala cement corridor — the railway threads the industrial cement district feeding the massive Lukala cement works (CILU)
  • Mbanza-Ngungu hillside descent — a dramatic drop from the savanna plateau into the Congo River gorge
  • Approach to Matadi — the railway crests the coastal ridge with the first views of the broad Congo estuary and the Matadi–Boma port complex
Quick Facts
  • Duration

    7.5 hours

  • Distance

    366 km

  • Est. Price

    US$25–50 one-way (First Class ~US$25, Premium ~US$35, Luxury/VIP ~US$50); prices paid in Congolese francs at the prevailing exchange rate, at least 48 hours before departure. No rail pass accepted.

Official Booking Provider

Classes & Accommodations

Meals: Snacks Available

Ensuite: No

Meals: None

Ensuite: No

Meals: None

Ensuite: No


Engine / Locomotive

Seven new Chinese-built air-conditioned diesel railcars (delivered 2023); one new 108-tonne China-built diesel locomotive (delivered 9 March 2026); heritage Belgian-era stock (Borsig, Tubize, Carels) operated the line for nearly a century until the 2023 fleet renewal

Locomotive Weight

108 tonnes (new China-built locomotive, March 2026); heritage Borsig/Tubize/Carels builds were typically 50–70 tonnes

Track Gauge

1,067 mm (3 ft 6 in) Cape gauge (converted from 600 mm narrow gauge in 1923)

Braking Technology

Air brake system on modern Chinese-built rolling stock; heritage stock used vacuum brakes with knuckle couplers

Route Engineering Challenges
  • 366 km single-track Cape-gauge corridor threading the Lower Congo hills to bypass the Livingstone Falls — the 32 cataracts that block the Congo River navigation between Kinshasa and the Atlantic

  • Gauge conversion from 600 mm narrow gauge to 1,067 mm Cape gauge completed in 1923 to standardise with the broader central African rail network

  • Tropical jungle maintenance environment — vegetation encroachment, ballast replenishment, and culvert clearing required year-round

  • November 2025 flood damage to the Kimwenza–Lemba section (repaired February 2026 ahead of the 28 February 2026 resumption)

  • Recurrent track defects and rolling-stock failures April 2026 triggered fresh suspension, with ONATRA announcing imminent resumption on 15 June 2026

  • Limited spare-parts inventory for the new Chinese-built fleet — order lead times from China are 6–9 months

  • Freight/passenger mixed operations on the National Road No. 1 relief corridor — freight hauliers continue using the rail line even when passenger service is paused

  • Karst hydrology and tropical wet-season erosion on the Mbanza-Ngungu hillside descent

Line length

366 km

Journey time

~7h 30min

First opened

2 July 1898 (under King Leopold II's Congo Free State)

Gauge conversion

1923 (600 mm narrow gauge → 1,067 mm Cape gauge)

Service resumption

28 February 2026 (after 5-year suspension)

Current status

Suspended mid-April 2026; ONATRA announced imminent resumption 15 June 2026

Previous suspension

February 2020–September 2025; Nov 2025–Feb 2026 (flood damage)

Fleet

7 new railcars (2023), 1 new locomotive (March 2026)

Operator

ONATRA (Office National des Transports)

Built by

Compagnie du Chemin de fer du Congo (CCFC), 1890–1898

Intermediate stops

13 (Matete, Kimwenza, Kasangulu, Kisantu, Lufu-Toto, Kwilu-Ngongo, Lukala, Kimpese, Songololo, Lufu, Mbanza-Ngungu, Kintoni, Madimba)

Currency on board

USD cash widely accepted; Congolese francs (CDF) at prevailing exchange rate; mobile money (M-Pesa, Airtel Money, Orange Money) accepted at the Kinshasa ticket office but not on board

Languages on board

French + Lingala + Kikongo ya leta (regional languages along the corridor)

Best travel window

Late May–early October (dry season, most reliable departures)

Cross-border gateway

Matadi Port Station → ferry to Boma and Angola's Cabinda exclave

Quick Facts
  • Duration

    7.5 hours

  • Distance

    366 km

  • Est. Price

    US$25–50 one-way (First Class ~US$25, Premium ~US$35, Luxury/VIP ~US$50); prices paid in Congolese francs at the prevailing exchange rate, at least 48 hours before departure. No rail pass accepted.

Official Booking Provider